1.0 Situation
Over the course of several months, site maintenance personnel
observed that lubrication system components were failing at
a rate higher then what would normally be expected.
Typically, grease injectors were being changed out at a rate
of 2 or 3 per month. A preliminary IRS inspection determined
that the frequency of failure had increased and injectors
were now being changed weekly. On inspection the injectors
were found to have dirt and metallic particles trapped with
in the seal and slide valve area of the internal components.
Grease pumps were also found to be failing after a very short
period of operation as a result of contamination.
Contamination also promoted an intermittent failure of the
system vent valve, which was preventing the needle and seat
valve from sealing.
The effect on plant reliability was significant. On average
6 hours per week had been lost in operational time and an
additional 12 man hours had been lost managing the situation.
2.0 Analysis
In an effort to better understand the nature and extent of
grease contamination that was adversely influencing operations
at the site, IRS technicians fitted high-pressure grease filters
to the following items of mining plant and equipment:
- P&H 2800 Shovel
- Cat 789 Dump Trucks
- Cat 994 Loader
- Bulk fill line on the delivery vehicle
Grease filters were fitted to the centralised
lubrication system pump on each item thus enabling
technicians to filter debris, over the two week trial period,
as it passed from the pump prior to entering the vent valve.
The filter element used is of wedge wire construction and
is rated at 150 micron. The element has a safe working pressure
of 6000psi or 41370 kPa.
Accumulated debris was solvent washed from the grease collected
on the element surface. Magnets were then used to separate
ferrous material from the collected debris.
3.0 Findings
3.1 Element
Figure 1 highlights obvious signs of debris imbedded into the element.

Figure 1 - Grease Filter Element
after cleaning
Accumulated debris was assessed to contain long fibrous particles as
displayed in Figure 3 and ferrous materials which are displayed in Figure
4

Figure 3 - Fibrous Materials
|
3.2 Contamination
Debris removed from the filter element at the completion of the trial confirmed
that injector failure most probably was due to the unnecessary ingress
of abrasive particles. The debris featured in Figure 2 was collected
from the filter element.

Figure 2 - Collected Debris
The fibrous materials consisted of wood fibre and paint
chips derived from the interior lining of the on-site grease storage
drums.

Figure 4 - Ferrous Particles |
4.0 Recommendations
Injector failure promoted through the accumulation of unnecessary
levels of contaminants will lead to inappropriate levels of
lubrication that could result in catastrophic, spontaneous
failures that will adversely impact on the operation and availability
of mining plant and equipment at the site.
IRS recommends the immediate implementation of the following
specific initiatives:
- All grease tanks should be cleaned internally.
- High-pressure grease filters should be fitted to all items
of plant and equipment that have automatic lube system.
- Grease filters should be cleaned on a regular basis and
the nature and extent of accumulated debris monitored.
- Breathers should be fitted to all grease tanks.
- All ports or openings must be sealed when not in use.
- Dedicated dipsticks must be fitted to grease tanks.
- Wooden sticks and broom handles must be removed from the
tops of all grease tanks thereby preventing them from inappropriately
being used to dip grease levels.
- The end of bulk filling hoses and couplings should be
cleaned before connection to grease tanks.
For more information related to grease contamination contact
Mark Drayton at Integrated Reliability Solutions on 0438 000
624.
|